Demolition · Specialty Lifting · Unusual Field Work

Practical solutions for
nonstandard work.

Construction equipment, lifting capability, controlled dismantling, material handling, foundation removal, and field problem-solving brought together for assignments that do not fit a standard scope.

Unusual work still requires a defined sequence.Stability · Utilities · Access · Lifting · Hot Work · Exclusion Zones · Final Condition
Specialty Safety ↓
Vehicle PlacementPlaced and secured on a completed
rescue-training tower
Commercial DemolitionLarge commercial buildings
and structures
Beyond the FoundationContinue construction after
foundation completion
Field + CustomFabrication for project-specific
field and shop requirements

Construction & Specialty Capabilities

Equipment is only
part of the solution.

The work begins with the required final condition, then connects structure stability, access, lifting, dismantling, material flow, below-grade scope, and site restoration.

01

Controlled Dismantling

Section-by-section removal using planned access, cutting, lifting, lowering, staging, and hauling.

02

Complete Demolition

Structures, framing, slabs, foundations, loading, hauling, recycling, disposal, and cleanup when included in scope.

03

Crane-Assisted Construction

Material handling, positioning, support, and specialty lifting after load, radius, access, rigging, and ground conditions are reviewed.

04

Temporary Installations

Unusual placement and temporary securing of objects for a defined purpose, duration, and later removal plan.

05

Slab & Foundation Removal

Removal below the structure when the project requires more than taking down the visible building or equipment.

06

Cutting & Sectional Lowering

Controlled separation of steel components while the released section remains supported through its path to the ground.

07

Loading, Hauling & Recycling

Material separation, loading, transportation, recycling, disposal, and required documentation defined in the proposal.

08

Difficult-Access Work

Project-specific equipment and sequencing for restricted sites, active facilities, unusual structures, and one-off assignments.

Plan From the Finish Backward

What must the site look like when the work is done?

That answer determines what must be supported, separated, lifted, removed, hauled, recycled, left in place, or restored.

  1. 01

    Define the final condition

    Identify what stays, what leaves, and the required condition of the structure, slab, foundations, grade, and work area.

  2. 02

    Understand the object and site

    Review dimensions, weight, materials, connections, condition, utilities, access, overhead clearance, and underground constraints.

  3. 03

    Control each transition

    Plan stability, temporary support, lifting points, rigging, cutting, hot work, access equipment, and exclusion zones.

  4. 04

    Plan the material path

    Connect dismantling to staging, loading, hauling, recycling, disposal, and the equipment needed at each step.

  5. 05

    Assign responsibility

    Define engineering, permits, utilities, safety authority, inspection, acceptance, documentation, and restoration.

Vehicle temporarily installed on the Roco Rescue shipping-container training tower

Verified Specialty Project · 2020

Vehicle positioned 30 ft above ground for Roco Rescue.

In Baton Rouge, Auger supplied an old damaged vehicle and lifted it with the company’s 20-ton National boom truck/crane to a training tower built from stacked shipping containers. The project was completed once the vehicle was secured approximately 30 ft above ground in a vertical position for training purposes.

The five-person crew positioned the vehicle nose-down with the passenger side facing outward. The installation used ropes, chain, and chain binders and took approximately two hours. Auger returned after the training period and removed the vehicle with the same crane.

Verified Demolition Project · 2018

Complete metal-building removal near Houma.

On the outskirts of Houma, Auger dismantled and removed an approximately 85-ft × 125-ft metal building. The private customer remains confidential.

Three-Person CrewCompleted the confirmed scope over approximately two weeks.
Complete RemovalBuilding, slab, foundations, and remaining demolition debris.
Equipment Roles20-ton crane for material handling; Manitex SC75 and scissor lift for personnel access.
Material FlowGooseneck trailer for hauling; metal recycled; concrete and debris removed.
Confirmed structural order
  1. 01Sheet metal
  2. 02Purlins
  3. 03Girts
  4. 04Trusses
  5. 05Uprights and columns
  6. 06Slab and foundations

Utilities had already been disconnected before Auger began. Public copy does not identify the customer, exact road, disposal facilities, or unverified teardown details.

Safety Through Every Stage

Control stability
as the work changes.

Specialty lifting and demolition can change the stability of a structure or object as connections are released, loads transfer, or sections move. The plan must address conditions before, during, and after every step.

Utility status
Structural condition
Temporary support
Hot-work controls
Lift & access zones
Stop-work authority

Project-specific safety requirements, access methods, lift responsibilities, hazardous-material obligations, inspections, and final acceptance are defined before work begins. No safety statistic or incident-free claim is used.

Before Pricing

Show us the existing condition and required result.

Photographs are helpful, but the evaluation also needs the dimensions, structure information, utilities, access, restrictions, and responsibility split that control the work.

Existing Condition

Photographs, drawings, dimensions, materials, connections, known weights, condition, and surroundings.

Site & Access

Equipment setup, travel paths, overhead clearance, underground conditions, utilities, traffic, public access, and operating restrictions.

Work Requirements

Lifting, temporary support, cutting, hot work, fall protection, hazardous materials, loading, hauling, recycling, and disposal.

Final Condition

What remains, what is removed, below-grade work, backfill, grading, restoration, inspection, documentation, and acceptance.

Questions & Answers

Frequently asked questions

What kinds of specialty assignments can you review?

Scopes include crane-assisted construction, temporary installations, structural handling, dismantling, demolition, and field fabrication. Each assignment is evaluated around the loads, access, existing conditions, and required result.

Can you continue construction after the foundation is complete?

Yes, connected construction and installation work can be included when the scope is defined and the project requirements can be met.

What should I provide for a dismantling project?

Send photographs, dimensions, available structural information, utility status, access restrictions, salvage requirements, and the condition in which the site must be left.

Have a different question? Contact Brad or read the general FAQ.

Discuss a Specialty Project

Send the condition,
scope, and final result.

Auger will review the assignment and identify the information needed to develop a practical field approach, define exclusions, and evaluate safety, equipment, schedule, and pricing.

Include when available

  • Project location, contact, and schedule
  • Photographs and existing-condition drawings
  • Object or structure dimensions, materials, and weights
  • Known lifting points and manufacturer information
  • Utility-isolation and hazardous-material information
  • Access, setup, clearance, and personnel-access requirements
  • Cutting, hot-work, hauling, recycling, and disposal requirements
  • Slab, foundation, below-grade, grading, and restoration scope