Foundations · Handling · Erection Support · Removal

From the foundation
to the structure.

Foundations and specialty field support for monopoles, towers, poles, commercial signs, and billboards—with Auger’s exact responsibility defined before the work begins.

Tall structures demand a controlled plan.Ground Conditions · Rigging · Working Radius · Wind · Elevated Access · Utilities · Exclusion Zones
Structure Safety ↓
Custom-Fabricated StructuresProject-specific steel work
built around the assigned scope
Towers & PolesFoundation, handling, erection,
repair, and removal support
Billboards & SignsFoundation, installation,
relocation, and removal support
Metal BuildingsFoundation, structural handling,
and controlled dismantling
VesselsFoundation and setting support
for engineered vessel structures

Towers, Poles & Signs

One structure.
Several separate scopes.

Auger may perform the foundation, drilling and casing, structure handling, erection support, repair, relocation, removal, or a combined assignment. The proposal identifies the exact responsibility.

01

Monopole & Tower Foundations

Large-diameter and deep foundations with dry, cased, or slurry-supported methods selected for the project conditions.

02

Sign & Billboard Foundations

Drilled-shaft and deep-pipe foundation work based on the permitted design, structure geometry, soil, groundwater, and access.

03

Direct-Burial Poles & Pipe

Excavation and installation support for direct-burial members, including lifting, alignment, backfill, or vibratory methods when contracted.

04

Steel & Structure Handling

Unloading, staging, lifting, positioning, and setting support when the load, radius, rigging, access, and equipment capacity are confirmed.

05

Erection Support

Crane or boom-truck assistance, access equipment, handling, positioning, and supervision with each party’s role identified.

06

Repair & Relocation

Project-specific support for repairs, replacement, or relocation after the structure, damage, access, and required trades are evaluated.

07

Controlled Removal

Planned dismantling, sectional lowering, below-grade cutting, hauling, recycling, and site restoration when included in scope.

08

Specialty Pole Foundations

Foundation construction for flagpoles, lighting structures, communications poles, and other engineered pole systems.

Scope Before Mobilization

Define who does what.

A single structure can combine engineering, foundations, lifting, steel work, electrical work, inspection, and acceptance. Those responsibilities should never be assumed.

01

Foundation

Layout, drilling, slurry or casing, reinforcement, embedded items, concrete, testing coordination, and cleanup.

02

Structure

Supply, fabrication, unloading, assembly, welding or bolting, lifting, alignment, final torque, and coating repair.

03

Electrical

Service, lighting, controls, grounding, isolation, inspection, and responsibility for any energized work.

04

Closeout

Final inspection, documentation, restoration, hauling, recycling, acceptance, and responsibility for the completed installation.

Representative Experience

Different structures.
Different field problems.

These examples describe only Auger’s confirmed portion of the work. Customer identities and uncertain details are intentionally withheld.

Groundwater management during tower foundation construction
Monopole Foundation

Patterson, Louisiana

12-ft diameter × 80-ft deep

A large slurry-supported monopole foundation with onsite reinforcement assembly, casing support, forms, and concrete coordination. Anchor bolts and the template were supplied by others.

Deep-Pipe Billboard Foundation

New Orleans Area

Approx. 4-ft pipe · 60-ft embedment

Auger operated the vibratory hammer to install the base pipe, completed the confirmed field connection, and supervised erection. Pipe fabrication, crane operation, above-ground erection, and electrical work were performed by others.

Controlled Sign Removal

Large Multi-Column Structure

Sectional dismantling · crane support

A tall illuminated sign was supported, dismantled in sections, lowered, hauled away, and cut below grade. The exact location and remaining project details will stay off the public site until final verification.

Safety Built Into the Sequence

Control the load.
Control the work area.

Tower, pole, and sign work requires the team to connect foundation stability, equipment position, rigging, working radius, elevated access, wind, utilities, surrounding operations, exclusion zones, and the removal or erection sequence.

Scope authorityGround conditionsLoad & radius reviewRigging planWind & weatherStop-work authority

Auger’s foundation and structure-support experience does not imply tower or RF engineering, antenna work, high-voltage electrical work, or responsibility for the entire completed structure unless specifically contracted and qualified.

Information That Controls the Plan

Start with the structure,
site, and exact role.

The erection or removal sequence must be evaluated together with the foundation, ground conditions, access, lifting requirements, utilities, operating restrictions, and final site condition.

  • Structure dataType, geometry, height, weight, center of gravity, lifting points, and manufacturer information.
  • Foundation dataDiameter, depth, reinforcement, embedment, anchor bolts, base plates, templates, and tolerances.
  • Site dataSoil, groundwater, access, laydown, utilities, traffic, overhead obstructions, and public exposure.
  • Execution dataCrane, rigging, access equipment, wind limits, assembly, inspection, restoration, and schedule.

Questions & Answers

Frequently asked questions

Can Auger install the foundation and erect the structure?

Both scopes can be evaluated. Monopole erection is performed when requested by the contractor and included in the assignment. The proposal defines foundation, handling, erection, and other responsibilities.

Can you help with an existing sign or structure?

Auger can review repair, relocation, handling, and controlled removal assignments. Provide photographs, available drawings, access information, and the required final condition.

Can you help arrange engineering?

Work is performed from engineer-provided plans. If engineering is needed, Auger can coordinate outside engineering support; the design responsibilities and costs must be defined for the project.

Have a different question? Contact Brad or read the general FAQ.

Request Tower, Pole or Sign Pricing

Send the drawings
and requested scope.

Complete information helps Auger evaluate foundation methods, structure handling, equipment, access, exclusions, safety requirements, schedule, and pricing.

Include when available

  • Structural and foundation drawings
  • Geotechnical report and foundation schedule
  • Structure dimensions, weights, and lifting points
  • Anchor-bolt, base-plate, template, and embedded-item details
  • Fabrication, welding, bolting, and coating requirements
  • Crane, rigging, manlift, assembly, and erection requirements
  • Electrical, utility, traffic, access, and permit information
  • Removal, hauling, recycling, restoration, and final-condition requirements